{"id":57598,"date":"2018-12-14T05:25:47","date_gmt":"2018-12-14T05:25:47","guid":{"rendered":"https:\/\/www.i-believe.org\/?p=57598"},"modified":"2018-12-14T05:25:47","modified_gmt":"2018-12-14T05:25:47","slug":"since-its-installation-a-year-ago-teslas-mega-battery-in-australia-has-saved-over-40-million-aud","status":"publish","type":"post","link":"https:\/\/i-believe.org\/gbrifoundation\/2018\/12\/14\/since-its-installation-a-year-ago-teslas-mega-battery-in-australia-has-saved-over-40-million-aud\/","title":{"rendered":"Since its installation a year ago, Tesla&#8217;s mega battery in Australia has saved over $40 million AUD"},"content":{"rendered":"<p>A year ago, Tesla installed the world&#8217;s largest lithium ion battery in Jamestown, South Australia, in order to help the area which had been facing some serious\u00a0electricity problems. Till today, the 100-megawatt Hornsdale Power Reserve, has saved over $40 million AUD in annual maintenance costs to the electrical grid, also known as frequency controlled ancillary services (FCAS).<\/p>\n<p>The battery was built in just 54 days after Tesla CEO Elon Musk made a bet with state legislators, saying that if he was unable to finish the battery in 100 days, he would give it to them for free.<\/p>\n<p>In addition to being a cheaper replacement to the fossil-fuel dependent system that was previously used by the energy market operator, the battery creates zero carbon emissions. It is also capable of responding to outages in a matter of milliseconds, which could not be achieved by previous backups.<\/p>\n<p>Read more here:\u00a0<a href=\"https:\/\/www.goodnewsnetwork.org\/south-australian-tesla-battery-saves-40-million-in-first-year\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.goodnewsnetwork.org\/south-australian-tesla-battery-saves-40-million-in-first-year\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A year ago, Tesla installed the world&#8217;s largest lithium ion battery in Jamestown, South Australia, in order to help the area which had been facing some serious\u00a0electricity problems. Till today, the 100-megawatt Hornsdale Power Reserve, has saved over $40 million AUD in annual maintenance costs to the electrical grid, also known as frequency controlled ancillary [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":57599,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[85],"tags":[],"class_list":["post-57598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-headlines"],"_links":{"self":[{"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/posts\/57598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/comments?post=57598"}],"version-history":[{"count":0,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/posts\/57598\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/media\/57599"}],"wp:attachment":[{"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/media?parent=57598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/categories?post=57598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/i-believe.org\/gbrifoundation\/wp-json\/wp\/v2\/tags?post=57598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}